The CENTRACO plant welcomed a heat exchanger from the Bugey nuclear power plant. It will be cut in the huge components workshop.

The 10 meter long and 13 tons masterpiece will be cut with the diamond wire machine.

The metal will then be sorted depending on its metallurgic nature. It will be melted in the foundry to be processed into ingot or when possible recycled into radiological shields.