The experience gained in supporting EDF decommissioning projects enables Cyclife to propose an integrated waste management approach to decommissioning that allows the selection and implementation of the best possible cutting plan and scenario, optimised in terms of time and waste management costs.
Find out more about our case studies below.
Decommissioning & Dismantling
Optioneering with BAT/BPM
Physical and radiological characterisation
Concept and detailed design
Waste Management
Waste on-site treatment
- Mobile Machines
- Machine for Coating Resins in Shells Using an Epoxy Resin - MERCURE mobile unit
- Pre-operation and operation of a facility for the conditioning and storage of activated waste - ICEDA
Waste container management, inspection and package licensing
- Mobile On-site Intervention Unit - UMIS
- UMIS at Your Service - Mobile Unit for Safe Nuclear Inspection
Large component management solutions
- Focus on the Management of Retired Large Components
- Waste Management and Shipment of Large Components
Optioneering with BAT/BPM
Logistics support in compliance with local regulators
Strategy definition: options assessment, bench, waste and D&D program
Safety case review and assessment
Bespoke training and consultancy
Concept and detailed design
- Concept Design for the Storage and Maintenance Facility for Waste Containers
- Design of a Hot Cell Dedicated to Packaging Operations
- Design, construction and operation of BAse de MAintenance de Saint-Dizier, BAMAS
- Design of a Machine for Coating Resins in Shells Using an Epoxy Resin - MERCURE mobile unit
Digital Solutions
For each stage of the industrial life cycle, discover the digital solutions that are right for you: collaborative platforms, decision support and work simulation software, on-site immersion using virtual reality with the deployment of digital twins, for simulation or training.